TUTORIAL: Penn 70VS

Started by kamuwela, March 24, 2010, 04:39:14 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

kamuwela


Grab a schematic & follow along. Going to be doing a Penn 70VS newer model.


Using penn tool, remove shift button retaining ring #110C & shift button assembly #172.


Remove shifter retaining plate #133.


Remove shifter catch holder #173B, retaining C-ring & shifter base plate sub-assembly #110B.


Remove handle.


Remove shield #50.


Remove left side plate assembly #27.


Remove spool #29L.


Remove right side plate assembly #1.


Remove & repack bearings & lightly coat plate.


Install repacked bearing.


Disassemble right side plate #1.


Remove main gear assembly. Add one drop each of corrosion X to click button assembly #36C & locating pin #161.


Remove ball bearing #55 & repack.


Remove cam follower #141, preset screw #143, eccentric cam #19, & cam thrust washer #4.


Grease plate & install cam thrust washer.


Install eccentric cam follower & preset screw.


Install repacked bearing #55.


Grease & install gear assembly.


Remove harness lugs #54.


Remove & grease stand #30.


Add some grease to screw holes & install stand.


Lightly grease screw holes on frame #183.


Grease & install harness lug #54.


Install left side plate.


Add grease to holes & install screws.


Unlock pin #156A & unscrew drag cover #156.


Remove drag washer #117D, left side bearing spring #41, metal drag washer #7A, & drag washer #117A.


Remove pinion gear #13.


Clean & grease drag washers wipe off excess. Use Shimano or Cal's drag grease.


Reinstall drag washers.


Remove ratchet #81.


Remove retaining ring #173, bearing #55, repack & reinstall bearing. Lightly grease screw holes & under ratchet.


Put a light coat of grease on ratchet & spool.


Install pinion gear.


Install pinion gear washer #67 & retaining screw #67A.


Install spool assembly.


Install disc clutch spring ()() in stock configuration. This can be changed, customer preferred the stock configuration.


Install plate #1.


Grease all holes & install screws.


Install cam thrust washer #4.


Install quadrant #2 & quadrant spacer/ratchet #2A.


Install eccentric lever #21.


Install bridge cover assembly #124B. Sorry pics are a little dark.


Grease inside & install shield #50.


Install handle screw locking plate #110A & handle screw #23.


Install shifter base plate sub line assembly #110B & C-clip #67B.


Install catch assembly #173A & shifter retaining plate #133.


Install shift button assembly #172 & shift button retaining ring #110C.


Use Penn wrench & tighten retaining ring.

Bryan Young

Kamu,

Thanks for the write-up.  Great as usual.  PM sent.

Bryan
:D I talk with every part I send out and each reel I repair so that they perform at the top of their game. :D

Roger

Kamu, once again, you them man.

Hey, If you ever get over run with servicing reels, give me a holler. I've always wanted to visit Hawaii.......
Roger

"Twenty years from now you will be more disappointed by the things you didn't do than by the ones you did do. So throw off the bowlines. Sail away from the safe harbor. Catch the trade winds in your sails. Explore. Dream. Discover."   Mark Twain

BigT

More great work, Kamu. That's a very good looking reel. You must have a tackle room where you need sunglasses with all that gold shining everywhere ;D


Cheers, BigT
more of my rebuilds on
http://www.fishraider.com.au